免费不卡在线观看_中文字幕在线高清不卡_青青影院东京热_人妻互换国内精品_成人免费一级毛片视频_久久亚洲老熟女cc98cm_最近中文字幕高清_亚洲欧美中文字幕网址_国产精品白丝无码ThePorn_一级男女性高爱潮在线观看

Sunway Machinery ManufacturingMANUFACTURER
24-Hour Information Hotline:+86-13386259279
Popular keywords: B. Zj -IV intelligent high-speed hose shoulder injection machine|B.GLS-III automatic soft control pipe machine|B. Kfx-ii hose opening and sealing screw (shoot) cap machine|B.GFN-100 filling and sealing machine
Your location: Homepage >News >Company news

Hotline

+86-13386259279

Foundation structure and cleaning of filling and sealing machine

Author: click:2278 Release time:2021-02-22

The filling and tail sealing machine shall clean the surface layer, bottom plate, upper mold double rocker, pipe trench, lower mold internal pin and correct positioning rod on time (the power supply must be cut off and repaired at normal temperature). For the position of the transmission system, salt free grease shall be added to the die double seesaw, pressure bar rolling bearing, rack, locating pin, slide rail, etc. Ensure the performance index of the equipment on time. Method of removing the tooth cutter: first plug the two drain holes of the lower die with a cotton ball, pour boiling water into the pipe groove of the upper die, fill the double rocker of the upper die, send it to the double rocker of the upper die in time, press the lower die, and soak the tooth cutter for several minutes until the removal is cut off for many times.


The filling and sealing machine is composed of a cleaning part and a gluing part. Its characteristics depend on that the cleaning part is composed of nine parts, in which the axial force remote rod organization is connected with the sprocket chain organization to form an overall sprocket chain organization. According to the rotation and shaking of the transmission chain and the transmission gear, the mechanical equipment and its heel sleeve are connected, An L-shaped support rod is turned over and placed in the rotating and shaking organization of the transmission gear. Two sprocket chains are respectively installed on both sides of the flat sprocket chain, so that the flat sprocket chain produces an annular sprocket chain, on which the subjective factors of the bottle bowl transmission chain are set. The filling and sealing mechanism of the gluing part is connected with the subjective factors according to the transmission belt, The stopper pressing organization and the stopper turning organization are assembled in the upper support frame by the capping sealing crank arm organization, the capping machine and the full-automatic sealing machine are assembled in the upper support frame by the capping sealing crank arm organization, the bottle feeding organization is placed on the bottle feeding swing rod, an anti retreat wedge groove is set on both sides of the bottle feeding swing rod, the full-automatic capping organization is placed above the support frame, and the reducer and motor are assembled into a group, Connected with the subjective factors, the bottle channel support plate lifting system is placed on the lower support frame, which is composed of four bottle channel elevator support frames with equal spacing. The bottle channel is built above the bottle channel elevator support frame, and the bottle filling is placed on the bottle channel, close to the bottle delivery swing rod.


Pay attention to its maintenance after the application of the filling and sealing machine. During the maintenance, remove the fixed screws on the piston rod and when removing the piston rod, so as to prevent endangering the processing process regulations of another one. Before cleaning the piston filling and tail sealing machine, remove the remaining products inside, and then fill the barrel with mild cleaning liquid. The cylinder has been moistened in the original factory. Please do not start or add all lubricating grease to ensure the daily cleaning of the surface of the tail sealing machine. Turn off the power when it is not working. In addition, inspection and adjustment should be carried out on time in addition to unremitting maintenance and proper application of the filling and sealing machine. Only in that way can the tail sealing machine work in good physical and mental health.


The full-automatic filling and sealing machine is different from the automatic tail sealing machine, that is, the small and medium-sized tail sealing machine with manpower. The full-automatic Canning is also full-automatic. Only the subsequent capping and cartoning stage is carried out manually. The key role of the full-automatic tail sealing machine is canning, with less additional functions. Unlike the automatic filling and sealing machine, it can be attached with conveyor belt, capping machine, marking machine Packing machine, automatic sealing machine and other attached machines and equipment.


Relevant recommendations

Nantong Tongzhou Sunway Machinery Manufacturing Co., Ltd. is a manufacturer of large emulsifying machine, pipe making machine and shoulder injection machine.

Record NoSu ICP Bei No. 2021006230-1  Site map    XMLmap   Technical support:Sueasy